Our Network

What We’re Building

OptiF is designing and deploying an independently owned dark fibre backbone engineered for next-generation AI, data center, and carrier connectivity. Our infrastructure is 400G/800G-ready, future-proofed for upcoming technologies including 6G, RF densification, digital twins, and quantum networking.

Planned Routes & Key Nodes

Phase 1: National Loop

Route: Dover → Penzance → Reading → Dover

Purpose: AI-ready national ring with direct transatlantic and continental entry points.

Core Route: Reading → Slough → London (financial & hyperscaler edge)

Phase 2: Northern Expansion

Route: Reading → Manchester → Edinburgh → Glasgow

Extended Link: Manchester → Isle of Man → Belfast

Extended Link: Manchester → Dublin

Deployment Status

Stage: Infrastructure Planning

Construction Start: Q1 2026

Permits & Compliance: Under regulatory preparation (Ofcom, local authorities)

Target Completion: End of 2029

Backhaul & Long-Haul Design: Modular fibre capable of multi-terabit capacity.

Engineering Highlights

High-core-count fibre (576+ cores possible)

Dedicated duct systems and joint boxes

Custom routing for ultra-low latency AI workloads

Passive and active route validation: OTDR, CD, PMD, latency, OSNR testing (upon deployment)

Edge-ready and metro extension capability

Visual Representation

Ducts, OTDR screenshots, splice closures are representative illustrations based on planned deployment architecture. Actual implementation will commence Q1 2026.

Why It Matters

This is not just another network — OptiF is being built from scratch, designed to outperform legacy routes plagued by high-loss splices, poor planning, or untested fibres.

With OptiF:

• Every route is measured and certified
• Infrastructure is AI-optimized from day one
• You’re investing in a clean-sheet, long-term asset with minimal signal degradation over decades